Location Gobind Darbar Manjhand
Project Duration Started: August 2014. Completed: April 2015.
GPS Coordinates 27.755831° N, 68.751985° E

Conservation
Conservation work commenced in the month of
August 2014, and completed in April 2015.

Board Approval: 20th June 2014 \ Rs. 0.5 million

The Gobindh Ram Darbar is located in Taluka Manjhand, District Jamshoro, about 60km
away from Hyderabad. The site is in the kacha area inside the flood-protected bund of the
Indus, covering an approximate area of 39504 square meters (0.9762 acres).
Condition
Only one red baked brick structure of Gobindh Ram Darbar remains; all other structures and vaulted
rooms around the Darbar have been demolished. The structure of the Darbar follows a square plan
with an entrance from the east. The Darbar is divided in four portions; a square mid, octagonal drum
and dome. It has four turrets, one at each corner, but at present only one survives. The Darbar has
frescoes in its interior; however, they are badly weathered and therefore not clearly visible.

Conservation
Conservation work commenced in the month of
August 2014, and completed in April 2015.

Board Approval: 20th June 2014 \ Rs. 0.5 million

The Gobindh Ram Darbar is located in Taluka Manjhand, District Jamshoro, about 60km
away from Hyderabad. The site is in the kacha area inside the flood-protected bund of the
Indus, covering an approximate area of 39504 square meters (0.9762 acres).
Condition
Only one red baked brick structure of Gobindh Ram Darbar remains; all other structures and vaulted
rooms around the Darbar have been demolished. The structure of the Darbar follows a square plan
with an entrance from the east. The Darbar is divided in four portions; a square mid, octagonal drum
and dome. It has four turrets, one at each corner, but at present only one survives. The Darbar has
frescoes in its interior; however, they are badly weathered and therefore not clearly visible.

The Reginal Office of EFT has recorded the timelines of conversational documentation along with details of projects , conditional reports and before and after phases for all completed projects. Click the report below to view and browse through the report of EFT’s Regional Office

Before Preservation

After Preservation